CCTC Project Share || Used "Oil Rig" Returned for Repair

企业微信截图_16831829379255

oil rig

return sth. for repair


Zhong Cheng Jian Project Sharing


Commodity prices have risen as a result of the escalating geopolitical conflicts that have shaken the world economy in recent years. The price of oil, as a major international energy source, has also been soaring. The demand for drilling rigs from oil companies is increasing. Due to the high value, large size, complex technology and long service life of "oil rigs", there is a growing demand for international transfer, moving, return and maintenance of used rigs.




classifier for principles, items, clauses, tasks, research projects etc

order (taxonomy)

contexts

The customer returned the two drilling rigs exported in 2014 to Tianjin port, and then transferred them to the factory's customs supervision area through the bonded area for re-maintenance and reconditioning for re-export.




Operating Points


High value

The combined value of the two rigs is approximately RMB190 million.

voluminous

The combined volume of the two rigs is approximately 11,000 cubic meters

many vehicles

Two trans-shipments with a cumulative transportation volume of approximately 350 vehicles/trans-shipment

long haulage distance

For the second transportation, it needs to be transferred from Tianjin Port supervised truck to the customer's designated supervised area 1,000 kilometers away.

low budget

The client required cost compression and control of the entire process to meet the owner's budget.

time constraint

In order to avoid high stockpiling fees and demurrage, cargoes need to be arranged for customs clearance and transshipment at the first time after arrival.





Responsibility & Mission



Increasing the level of innovation

CJSC, in cooperation with Tianjin Haikongda Company, was entrusted by the customer and coordinated with the Customs, Customs, bonded warehouses and related parties of the fleet at the first time, eliminated all kinds of difficulties, and successfully transferred the cargoes to the temporary warehouses of bonded area before the Chinese New Year in only two weeks. After that, all the cargoes were transported to the designated area 1000 kilometers away for repair and maintenance within the time required by the customer.




Summary & Impact


classifier for principles, items, clauses, tasks, research projects etc

order (taxonomy)

results-based

       The project was time-critical, task-heavy, difficult and high-risk. Under the multiple pressures of epidemic and Chinese New Year, CJC overcame all kinds of difficulties, actively coordinated with customs, road traffic control, insurance companies, warehouses, terminals and other related departments, and completed the transportation task on time within the customer's budget, which was well received by the owner and related parties.



We are working with a new development model and clear strategic goals.

Continuing to work miracles of growth

- A good partner in international engineering, "China Chengjian" supply chain -


Contact Tel: 022-60270659/15822815335

E-mail: info@cecsc.com.cn

If you need

We'll help you with a proposal.

Choosing CCTC Supply Chain = Choosing Integrity + Quality

        Recognize the QR code~Follow us